Mechanical Services

This section covers air conditioning, mechanical ventilation, and aspects of the Building Mechanical System (BMS).

Connection interphase to base building BMS must be discussed with the Building Management Team prior to any HVAC mechanical services works commencing in the fit-out.

During your fit-out, please provide your Project Manager with detailed plans showing the location of all staff, equipment, and lighting so the heat load and the usage of all areas can be determined. The Project Manager will also need to provide these plans to the Building Management Team’s preferred air conditioning consultant.

Ductwork modifications must be minimised to maintain straight duct runs, the use of flexible ducts need to kept to a minimum with bends kept under radius of 1.5 diameters.

Areas which are highly partitioned or have floor to slab partitioning must have sufficient return air grilles to allow return air to traverse the above ceiling space when partitioned doors are shut.

Tenancies on multi-tenanted floors may require either acoustic security transfer ducts across the tenancy dividing partition or return air grilles in the tenancy wall to the core corridor and corridor ceiling grilles; to allow the return air from the tenancy to leave the tenancy and return to the false ceiling level to return to the return air riser.

Air and water balancing of fit-out works must be performed by approved balancing contractors. The final balancing detail must be reviewed by the base building services consultant.

 

10-20 Bond Street

Air conditioning, Mechanical Ventilation
and Building Automation System (BAS).

Type
Information
Air Conditioning
Chiller 35.1 and 35.2 Trane CVHG780 2425 kWr - HFC 123a Centrifugal
Chiller 35.3 and 35.4 RDHD-1 986 kWr - HFC 123a Helical Screw
Each on-floor plant room and central chilled water plant has an active chilled beam air conditioning system with air handling units.  
Internal Conditions
SUMMER | Dry Bulb Temperature (°C) 23°C +/- 1.5°C
SUMMER | Relative Humidity (%) 50%
WINTER | Dry Bulb Temperature (°C) 21°C +/- 1.5°C
WINTER | Relative Humidity (%) 50%
External Design Conditions
SUMMER | Dry Bulb Temperature (°C) 32°C
SUMMER | Wet Bulb Temperature (°C) 23°C
WINTER | Dry Bulb Temperature (°C) 7°C
Tenant Condenser Water System Capacity
Cooling Capacity (NLA) (W/m²) 25W/m2
Heat Rejection (NLA) (Wm²)
Water Allocation (NLA) (L/s)/m2 Dependent on location in the building
Water Temperature L1-L13: 32.2°C to 37.2°C  
L14-L31: 29.5°C to 35.0°C
Internal Loads
Population Density (NLA) Office 1 person / 10m2
Lighting (W/m2) 10 W/m² for office lighting (total for base and tenant)
Outside Air | Minimum (L/s/person) 10
Maximum Noise Levels
Office areas (NR) 45
After Hours Air Conditioning
AHU | Whole Floor ($/hour) + GST $50
Normal Hours of Operation of Air Conditioning Plant 7:00am – 6:30pm Weekdays
Zones Per Floor
Number of Zones 20 thermostat-controlled zones
VAV's No of VAV’s per floor dependant on NLA
General Exhaust Riser
Capacity | Average per Floor (L/s)
Capacity | Maximum for One Floor (L/s)
Capacity | Toilet Exhaust (L/s per floor)
Supplementary Fresh Air Riser
Average per Floor (L/s) 200
Maximum for One Floor 200
Return Air Through Ceiling Space to RA Riser Yes
Building Monitoring and Control System
Type Conservia PTY LTD
Availability for Tenancy Monitoring 
(subject to approval)
Building Envelope Glazing
SC Maximum
U Maximum (w/m2K)

Electrical, Security, Communications Systems

The electrical and security systems provided by Investa are designed to be tenant friendly, enabling efficient general servicing and substantial and regular fit-out alterations, with minimal inconvenience.

Prior to any demolition works, your Project Manager must check existing cables (power, data and communications) in the tenancy and obtain approval from the Building Management Team for any isolation or cutting of these cables.

This is to avoid accidental damage to existing base building cables, and impact to base building equipment operations. If the Building Management Team have not been advised and proper authorisation not provided to the main contractor, it will be the Lessee’s responsibility to restore damaged services.

 

Tenant Lighting

Lights are controlled from group switches.

Tenant Distribution Boards

All electrical circuits and GPOs must be numbered (circuit number and distribution board number) and the distribution board permanently labelled as appropriate. The load across phases must be balanced.

Wiring

All wiring run in ceiling spaces, including the central service corridor, must be supported on trays or catenaries, or clipped to the slab and bundled by means of cable ties.

No wiring whatsoever will be allowed to lie on the ceiling grid or tiles, be clipped to the sprinkler pipe work or run in the data cable trays.

To assist you with the cabling of power and communications cabling from the core area services, cupboards to the tenancy area facilities have been provided and are mentioned below.

Design & performance parameters
Tower
Power supply
Substation Arrangement
Capacity (kVA)
Configuration
Feeder Arrangement
Tenant power supply
Determined by relevant (NLA)(VA/m2)
Standby power
Type of Drive Diesel
Number of Sets 2
Rating 2300kVA
Operation Arranged for automatic operation upon loss of normal supply, but with decision making by in-house SCADA system.
Control PLC control enabling flexible operation upon total loss of supply and during power restrictions
Fuel Storage
Base Building Standby
Tenant Standby Power Capacity - 
Determined by relevant NLA (m²)
Tenancy floor cabling facilities
In ceiling cable tray throughout core corridors
Core and perimeter conduit droppers from ceiling to skirting duct.
Ducted Skirting
Other Systems
Telephone Cabling
Incoming Cable Location
MDF Location
Pairs per Floor 1 pair 10m² 150 pairs of voice-grade cabling per tenant floor. Three empty optic fibre straws per tenant floor. 
Building Lighting
Lighting Type Varies between fitouts
Tenancy Lighting
Average maintained level of luminance (Open Plan) (lux)
Fittings Varies between fitouts
Emergency and Exit Lighting
Compliance (Standard) AS2293.1
Tenant Fittings Single Point
Type Computer monitored
Security and Access Control System
System Features
Manufacturer
Card Type Proximity
24 hour/7 day monitoring from Security Desk Yes
Time lapse VCR/DVR Recording Yes
Tape Image Retention Period 30 days
Extent of System (Areas Covered)
Car Park After Hours Yes
Building After Hours Yes
Lift Control After Hours Yes
Fire Stair Door Locking and Monitoring Yes
Plantrooms No
Loading Dock Yes
Closed Circuit Television (CCTV)
Building Entry and Exit Points Yes
Common and Public Areas Yes
Car Parks No
Loading Docks Yes
Goods Lift Yes
Car Park Lifts Yes
MATV System
TV Channels 2, 7, 9, 10, ABC - Free to Air Channels (Digital)
UHF 28
Foxtel
Radio Digital
Antennae and Satellite Dish
Provisions available (subject to review and consideration of existing installations)
Communications
Main Distribution Frame 
(pairs per floor)
200 pairs per floor
Intermediate Distribution Frame
(on floor, pairs per floor)
2 x 27 frames on each level

Hydraulic Services

The hydraulic services consist of the following systems:
  • Sewer drainage
  • Grease waste drainage
  • Hot water service
  • Cold water service
  • Fire hydrant & hose reel service
  • Sump pumps
  • Gas service
  • Downpipe and roof drainage
  • Dedicated cooling tower supply
  • Sanitary plumbing
  • The operation of plant and equipment is monitored by the BMS.
  • Stormwater and sub-soil drainage
Design and Performance Parameters
Provisional Services on Office Floors
Trade Waste Service 
(Grease Stack available on all levels)
Yes
Soil and Waste Services
Sanitary stacks available on all levels
Yes
Cold Water Service
Water risers adjacent to stacks with isolation valves
Yes
Floor Coverage for provisional services
TIM Graphics
Fire Services

Fire Services

The Life Safety Systems associated with the building are designed to a high commercial standard and maintained and tested to ensure compliance with the prevailing Australian standards.

The Premises has a Fire Engineering Consultant that certifies the building annually and on an ongoing basis. All tenant areas that are altered or refurbished will be required to engage the Premises Consultant to review and carry out final sign off for the fire safety measures at the tenant’s expense.

The classification and hazard rating for the building is as follows:

  • Tenanted areas are Ordinary Hazard I;
  • Car Park Ordinary Hazard II; and
  • Retail areas Ordinary Hazard III.

Smoke System

Addressable Smoke detectors interfaced to the base building main fire monitoring system are mounted above each fire exit door and return air riser. These detectors are sensitive to dust and smoke which may be generated as a result of fit-out works. The Project Manager shall notify the Building Management Team in writing when dusty or smoky works may take place so that the detector(s) may be isolated. A Fire Impairment Form must be completed and lodged prior to any isolation taking place.  

Any charges incurred from Fire Brigade attendance for false alarms associated with fit-out works will be charged to the Project Manager. Under no circumstances are smoke detectors to remain isolated overnight after works have been completed.

Hose Reels

The hose reel cupboard adjacent to the fire stair door must remain accessible from the fire stair. All parts of a tenancy must be reachable by a hose reel. The Project Manager will arrange for additional hose reels to be installed to achieve this if required.

Coordination and notification to the Building Management Team is required in the event of Hose reel shut down being required.

Note that access to the aforementioned fire stairs from each level of the tower is not available at any times (unless there is an emergency).

Emergency and Exit Lighting

Emergency and exit lighting is installed on an open plan basis to comply with safety requirements. As a result of the tenancy fit-out, further emergency and exit lighting may be required, and any such additional lighting is at your expense and must comply with safety requirements.

Whilst Management will undertake 6-monthly emergency exit light testing, it is your responsibility to install service and repair exit lighting. Investa can arrange this on your behalf and this sundry charge will appear on your monthly rental invoice.

A certificate of compliance for the tenancy area Emergency and Exit Lighting must be supplied as part of the tenancy Fire and Essential Services documentation.

The following table contains the design parameters of the fire and emergency systems.

 

Emergency Warning and Intercommunications System

The Emergency Warning and Intercommunications System (EWIS) incorporate speakers, which are distributed throughout the building and tenancy areas. Tenancy fit outs generally attenuate the volume of the EWIS speakers, and the Project Manager shall ensure that additional speakers are installed, or speakers are relocated as necessary to achieve authority compliance (AS2220).

While general EWIS speaker wiring can be performed by the tenant’s contractors as part of the fit-out works, any disconnection from or connection to the ‘live’ EWIS must only be performed by the building preferred contractor. The Project Manager will be held responsible for any damage to the EWIS which results from unauthorised disconnection or connection.

Sprinkler System Isolations

  • Drain downs must be kept to an absolute minimum. Any drain downs must receive approval from the Building Management Team with no less than 24 hours' notice
  • Drain downs left overnight or for an extended period are conditional on approval by the building insurers and adherence to any requirements imposed by the insurers. Any costs associated with this approval and subsequent conditions will be the responsibility of your Project Manager.
  • Drain down and refill operations will only be performed by the building preferred contractor, without exceptions.

  • The existing sprinkler system will be retained in service whilst new pipe work is being installed, and all new pipes must be cut over during one drain down. Sprinkler systems must be refilled and operational overnight and on weekends.
Design & performance parameters
Tower
Sprinkler installation
Standard AS2118.1-1995
Average Spacing per head Determined by fire consultant
Sprinkler Head Type Underside of ceilings fitted with white two part adjustable semi-recessed escutcheon or fully concealed
Office Hazard Rating Ordinary Hazard 1
Car Park and Retail Hazard Rating Ordinary Hazard 2
Goods Lift Lobbies Yes
Floor Fire Stair Doors Yes
For operation of mechanical plant under AS1851 2005 Yes
Fire monitoring system
Type Automatic FIP and EWIS System
Other Sprinkler system, hydrant/hose reels and extinguishers installed on each floor
Smoke Detectors AS1670.1
Emergency warning and intercommunication system
Type
Code Compliance

AS2220.1 & 2

Maximum Area per Speaker on office floor standard! AS2220.1 & 2
Hydrant and Hose Reels
Number per Floor (In accordance with BCA and NSWFB Spec 10)
Performance

Lift services

Design & performance parameters
Tower
General Lift Parameters
Lifts provided by back-up power Yes
Security Yes
Power System
Number of Lifts Per Rise
Low Rise
High Rise
Car Park
Goods Lift
Speed
Low Rise (m/s)
High Rise (m/s)
Car Park (m/s)
Duty (kg)
Low Rise
High Rise
Goods Lift
Average Waiting Interval (sec)
Low Rise
High Rise
Population Density (person/m² NLA)
Low Rise
High Rise
Passenger Lift Dimensions (mm)
Door Opening Size - Width
Door Opening Size - Height 
Internal Car Dimensions - Width 
Internal Car Dimension - Depth 
Internal Car Dimension - Height
Goods Lift Dimensions (mm)
Outer Dimensions
Access Door Dimensions

Building Mechanical System (BMS)

The BMS provides control and monitoring of all major air conditioning and ventilation plant, in addition to monitoring of selected, important aspects of other services.

A system of centralised Building Automation System. The system is fully automatic at each level of operation.

Workstation A work station complete with high resolution monitor, keyboard and mouse is located in the Building Management Office.
Power Supply The BAS is powered by house power.
External Monitoring The BAS system may be accessed remotely as required.
Sensors Space temperature sensors have an accuracy of +/-0.3°C.
Alarms Alarm points are capable of assignment of at least three priorities to allow grading of alarms from critical to non-critical. Email is sent to Building Management.
Scheduling All systems are provided with time scheduling on a seven-day basis with holidays capable of being programmed
 at least one year in advance.
Control Point Adjustments

All control points are fully adjustable from the central workstation.

Logging Some system points are provided with both trend and event logging facilities.
Reports Generated as required
Graphics Graphics are provided to designate systems using real time values, dynamically updated at least every 90 seconds.
Services The BAS monitors or controls the various building services as follows:
  • Mechanical Services
  • Air conditioning is provided with Direct Digital Control (DDC) system. The central plant is controlled by a selection of master sensors from various floors.
The following programmes are provided:
  • Optimum start-stop of main air conditioning plant
  • Outside air economy cycle initiation and control
  • Optimum chiller sequencing of all chillers
  • Boiler sequencing.
  • After hours air conditioning is logged by the BMS system and includes the number of hours run, the time, date and floor for which it is required. AHAC can be activated with an authorised access card swiping over the AHAC reader located next to the directory board on Bligh Street Entrance.
  • Electrical Services
  • Lift Services
  • OTIS REM lift monitoring
  • Fire Services
  • The BAS monitors the alarms and sends an email to the Building Management Team.
  • Hydraulic Services
  • The BAS monitors the alarms and status of the hydraulic services.

Other Specifications

Design and Performance Parameters
Ceiling
System Suspended mineral fibre ceilings tiles with flush set suspended perimeter plasterboard ceiling margin to floor plate. 
Grid 1200mm x 1200 module
Floor to Ceiling Height 2.7
Slab to Slab 3.75
Parking
Capacity N/A
Access
Maximum height clearance Car park area = 2.2 metres
Loading dock = 3.6 metres
Bicycle parking
Amenities
Accessible Toilets All levels
Shower Facilities Lower ground

Building Service Contractors

Should you wish to carry out day-to-day repairs or maintenance within your tenancy, we encourage you to engage the preferred vendors, consultants and technicians of Investa to perform the works. Our contractors are familiar with the building’s systems and safety requirements and are already site inducted, which is advantageous when planning or performing works.

The preferred vendors of Investa can be engaged via either of the following methods:

  • By submitting an Investa Connect Help Desk request – Building Management will then liaise with the vendor on your behalf to arrange for the works to be carried out. Building Management will seek your approval regarding associated costs, which would then be re-charged to you as a sundry charge on the monthly rental invoice, or
  • By contacting the vendor, technician or consultant directly and arranging the required tenancy works. The contractor, technician or consultant can then invoice you directly.

Below is a list of the preferred consultants, contractors and service technicians at the building. As this online list will be updated periodically, we encourage you to retain the link so it is readily accessible to your relevant staff. 

Services
Contractor Company
Contact Information
Access Control Grand Group 02 9755 5840
Auto Doors Record Doors 1300 172 743
BAS
BMCS Conservia 03 9918 7766
BMU N/A N/A
CCTV Securecore 1300 856 612
Certifier MBC Group 02 9939 1530
Cleaning Services So Clean 1300 300 328
Communications
Data Commissioning
DAS
Doors Record Doors 1300 172 743
Electrical MSB Electrical Services   1300 720 824
Emergency and Exit Lighting MSB Electrical Services  1300 720 824
Fire Services and EWIS DEM Fire  1300 510 854
Flooring
Glass Works
Handyman Alpha Nobis 

(02) 8076 4627

Hydraulic Services Atlantic Plumbing  (02) 9966 9690
Hygiene Services Flick Hygiene  (02) 8381 1773
Indoor/Outdoor Plants Posh Plants 02 9410 0204
Lifts and Escalators Schindler 02 9931 9900
Master Key System Hildebrandt Locksmiths  (02) 9212 5211
MATV System
Mechanical Services Tri-Air Projects  9816 1968
Security Services Grand Group 02 9755 5840
Thermograph MSB Electrical Services  1300 720 824
Waste Removal Veolia  (02) 9707 1709

Pest Control 

Flick Pest  8381 1773
Window Cleaning Ultra Clean Services (02) 9879 6669
Warden / Emergency Training AESC  1300 237 200

Engineering Consultants

Services
Contractor Company
Contact Information
Mechanical Services

NDY

02 9283 0019
Electrical Services NDY 02 9928 6800
Structural Engineering

TTW

02 9439 7288
Hydraulic Services NDY 02 9928 6800
Fire Services CORE 02 9299 6605
BMCS Cortina 03 9918 7766
DAS WCS 02 9299 1312
Context

Distributed Antenna System (DAS)

Providing a quality mobile phone coverage experience within a building is achieved using a dedicated in-building system known as a Distributed Antenna System (DAS), sometimes referred to as In-Building Coverage (IBC) system. The system is installed throughout the building including cables in risers and ceilings, and antennas below the ceiling within the tenancy, lift lobbies and public areas. The service is delivered via white (unless painted) dome antennas and will be visible when installed below the ceiling. In some instances, the antennas may have been placed above the ceiling, however this is to the detriment of the performance of the system.


Due the topology of these systems any damage to an antenna or cabling within the ceiling may have an impact on a larger portion of the system beyond the immediate impacted area. Damage to the system results in not only a deterioration of mobile performance below the antenna, but over the entire ‘sector’ - often 10+ floors with significant deterioration of performance in lifts. Consequently, the preservation and adjustment of the system to accommodate a specific tenant fit-out is critical. A DAS is highly specialised equipment and should not be handled by a standard electrician or builder.


The most recent version of the Mobile Carrier Forum (MCF) Guidelines published in November 2018 represents the latest set of operator guidelines outlining details of performance requirements, testing requirements, installation standards and PIM expectations as a point of reference for DAS works.

Tenant Activity Impact

There are primarily three (3) ways in which the DAS performance can be negatively impacted as a result of a tenant activity.
  • Modification of floor fit-out

    Changes to the fit-out may limit the quality of coverage throughout the floor, particularly if new walls are being erected for offices and meeting rooms. For example, antennas being isolated in enclosed area may significantly impact the performance of the DAS throughout the floor.

  • Relocation/Damage to Infrastructure

    Undertaking any tenant fit-out or refurbishment resulting in antennas being placed above the ceiling, removed, or damaged will lead to coverage gaps and deterioration of the ‘sector’ of the DAS within the building. Similarly, it is not uncommon for coaxial cable to be cut or bent beyond the prescribed bend radius which can result in cables having to be replaced in their entirety to achieve the required DAS performance levels.

  • Passive Intermodulation (PIM) Interference

    A more subtle activity may result in the creation of interference on the system whereby the materials of nearby items including fit out materials and furniture (particularly metal) can negatively impact the performance of the system. Typical issues come in the form of emergency lights, sprinklers, metal lockers, etc. This is generally not malicious damage, but it will result in a deterioration of performance. Typically, any DAS works on a given floor should be at the back of a fit-out process to allow for PIM optimisation once all the new structures are in place.

Process to Limit Impact

As with all utilities the preservation of the DAS is paramount. All costs associated with retaining the DAS in its’ operational state during and immediately after the fitout will be borne by the fitout contractor and their respective client.

DAS system with a lead operator. Tenant Fitout

Refer to the specific license between the landlord and the operator for specific process and notification periods. However typically the process will progress as follows.

1. Provide notice to the operator of the upcoming changes to the floor including relevant information - typically RCPs and partition plans will provide the operator with the information required to move forward.

2. The lead operator may choose to pursue works themselves and will likely provide a quotation, or they may be willing to refer the work to a qualified party depending on the scope and the operator’s policies

3. As the system is live it’s likely that works will need to be completed within an ‘outage’ period, usually at night or out of hours, where the operator will power down the system for WH&S reasons.

4. The operator may put in place documentation or testing regimes in line with their requirements.

Please contact the site facilities manager or other landlord representative should you require further information.
Further DAS related technical support is available from Wireless Coverage Solutions Pty Ltd.
P: 1800 318 039
E: info@wirelesscoverage.com.au
W: www.wirelesscoverage.com.au